How the Network Charging Compensation Scheme Cuts Business Energy Costs 

The Network Charging Compensation Scheme (NCC scheme) is a UK government scheme that refunds energy intensive industries (EIIs) for 90% of the electricity network charges they pay to use the Great Britain grid.

The 90% rate applies to network charges incurred from 1 April 2026. Before that, the scheme paid 60%. 


Written by Daniel Hill 
Updated: 27th October 2026 
13 min read 

Network Charging Compensation Scheme.

The scheme is part of the British Industry Supercharger, is run day to day by Elexon, and is paid for through the EII support levy, a charge on electricity suppliers that is passed on to other customers. So even if your business can't claim, the scheme still touches your bill, and it's worth knowing how it works. 

This guide explains who qualifies, how NCC claims work, the claim deadlines for 2026 and 2027, what the EII support levy could add to a typical business electricity bill, and how carbon pricing and carbon leakage sit behind the whole policy. 

The NCC Scheme at a glance

What is it? Government compensation for part of the electricity network charges paid by eligible energy intensive industries in Great Britain. 
Compensation rate 90% of eligible network charges from 1 April 2026 (60% for charges incurred from April 2024 to March 2026). 
Charges covered Transmission (TNUoS), distribution (DUoS) and balancing (BSUoS) charges.
Who can claim? Businesses holding a valid EII certificate for the whole month being claimed.
Policy owner Department for Business and Trade, now the Department for Business, Innovation, Science and Trade. 
Administrator Elexon, through the online NCC portal. 
How often?  Quarterly, with a two-month application window from Q2 2026 onwards. 
When is it paid?  About 12 months in arrears, so the first 90% payments are expected after April 2027. 
How is it funded?  The EII support levy on licensed electricity suppliers, recovered from their customers.
How big is it?  Up to £420 million a year, available to 586 industrial firms (government figures, March 2026). 
Where does it apply?  England, Scotland and Wales (not Northern Ireland) 

 

What is the Network Charging Compensation Scheme?

Every business that uses electricity pays towards the cost of building, running and balancing the grid. These network charges are usually built into your unit rate and standing charge, or shown as separate lines if you're on a pass-through contract. For most businesses they're a modest part of the bill. For a steelworks, glass furnace or paper mill running around the clock, they're a major operating cost. 

The NCC scheme gives eligible energy intensive industries money back on those charges. It doesn't change the charges themselves. The business keeps paying its supplier as normal, then claims compensation from Elexon each quarter. The scheme was created by the Energy-Intensive Industry Electricity Support Payments and Levy Regulations 2024, using powers in the Energy Act 2023, and the 90% rate was introduced by an amending set of regulations in 2026. 

Part of the British Industry Supercharger


The NCC scheme is one of three measures in the British Industry Supercharger, the government's package to bring electricity costs for strategic industries closer to those paid by competitors overseas. All three use the same eligibility rules.

Renewables levy exemption 100% exemption from the indirect costs of Contracts for Difference, the Renewables Obligation and Feed-in Tariffs.  1 April 2024
Capacity Market exemption 100% exemption from the costs of the Capacity Market.  October 2024
Network Charging Compensation Compensation for network charges, now at 90%. Payments since April 2025, backdated to April 2024

 

Why the rate rose from 60% to 90%

The government announced the uplift in its Modern Industrial Strategy in June 2025, consulted on it in July and August, and confirmed it on 31 October 2025. More than 85% of respondents who answered the question supported the change. Businesses and trade bodies had argued that competitor countries offer up to 90% compensation, so 60% still left British manufacturers at a disadvantage. Parliament approved the regulations and the 90% rate came into force on 1 April 2026. 

The same change doubled each quarterly claim window from one month to two. Under the original rules, a business that missed the one-month window lost three months of compensation, because late claims aren't allowed. 

Why the scheme exists: carbon leakage and carbon pricing 

The NCC scheme is a competitiveness measure, but its purpose is closely tied to climate policy. The government's explanatory memorandum for the 2026 regulations says the uplift aims to reduce the risk of carbon leakage and keep foundational manufacturing investment and jobs in Great Britain. 

Carbon leakage meaning and definition 

Carbon leakage is when production, and the emissions that come with it, moves from one country to another because climate rules and carbon prices are stricter in one place than the other. The UK government defines carbon leakage as the movement of production and associated emissions between countries due to different levels of decarbonisation effort through carbon pricing and climate regulation, which undermines overall efforts to cut global emissions. 

In practice, carbon leakage looks like a UK factory cutting output or closing while the same product is made somewhere with weaker climate rules and cheaper power. UK emissions fall on paper, but global emissions don't, and the UK loses the jobs and investment. That's why the UK Emissions Trading Scheme gives extra free allowances to sectors at risk of leakage, and why the Supercharger exists. 

How carbon pricing feeds into electricity costs 

Carbon pricing puts a cost on greenhouse gas emissions so that those who emit pay for their climate impact. In the UK, the main carbon pricing tools that affect electricity are: 

  • The UK Emissions Trading Scheme (UK ETS), a cap-and-trade scheme that started on 1 January 2021. Power stations, heavy industry, aviation and maritime operators must surrender an allowance for every tonne of emissions, and the cap falls over time. 

  • Carbon Price Support, a tax on the fossil fuels used to generate electricity. HMRC's rate for gas is £0.00331 per kWh, fixed until 31 March 2028. 

Alongside these, businesses pay the Climate Change Levy directly on the energy they use. For electricity, the main rate is 0.801p per kWh from 1 April 2026, rising to 0.827p per kWh from 1 April 2027. 

Generators build their carbon costs into wholesale electricity prices, and policy costs such as the Renewables Obligation and Contracts for Difference are added to bills on top. The 2026 explanatory memorandum notes that overseas competitors often pay less for electricity because they operate under less stringent environmental rules or receive more generous subsidies. Energy intensive manufacturers selling into global markets can't easily pass those costs on, so the Supercharger is designed to narrow the gap. 

Where the carbon border adjustment mechanism fits

From 1 January 2027, the UK is introducing a carbon border adjustment mechanism (CBAM). It's a new tax that applies a carbon price to certain imports from the aluminium, cement, fertiliser, hydrogen, and iron and steel sectors, so they face a carbon price comparable to goods made in the UK. Businesses importing £50,000 or more of these goods over a 12-month period are directly affected. 

CBAM tackles carbon leakage from the other direction. The NCC scheme lowers costs for UK producers, while CBAM raises costs for high-carbon imports. Indirect emissions, meaning the emissions from the electricity used to make a product, won't be included in CBAM until 2029 at the earliest, reflecting the continued compensation support for energy intensive industries. 

How the NCC scheme cuts business electricity costs

The scheme works as a rebate. An eligible business pays its electricity bills in full, works out the eligible network charges for each meter covered by its EII certificate, and claims 90% of that amount back. Government figures put the value of the uplifted scheme at up to £420 million a year for the UK's most energy intensive firms, which together employ around 400,000 people. 

Worked example: 60% vs 90%

Monthly eligible network charges £10,000 £10,000
Monthly compensation £6,000 £9,000
Network charges the business still bears £4,000 £1,000
Annual compensation £72,000 £108,000


On the same charges, the business receives an extra £36,000 a year, and the network cost it actually bears falls by 75%, from £4,000 to £1,000 a month.

Partial exemptions 

Not every meter qualifies in full. If a site makes both eligible and non-eligible products, its EII certificate sets an exemption percentage for each meter, and compensation only applies to that share. Using Elexon's example, a meter with a 70% exemption and £10,000 of network charges has £7,000 of eligible charges, so the claim is worth £6,300 at the 90% rate. 

What it means for your cost per kWh 

Because network charges are part of what a manufacturer pays for every unit of electricity, compensating 90% of them lowers its effective cost per kWh across the year. The exact saving depends on location, voltage and how a site draws power, because network charges vary by region and time of use. Our guide to peak demand charges explains why two sites with the same consumption can face very different network costs. 

Transmission Network Use of System (TNUoS) 

The high-voltage transmission network, including annual connection charges and transmission losses 

Yes 

Distribution Use of System (DUoS) 

Regional distribution networks, including annual connection charges and distribution losses 

Yes 

Balancing Services Use of System (BSUoS) 

Balancing supply and demand on the grid in real time 

Yes 

Wholesale electricity 

The energy itself 

No 

Supplier costs and margin 

Supplier running costs, metering and broker fees 

No 

Renewables and Capacity Market costs 

RO, CfD, FiT and Capacity Market 

No, but EIIs get a separate exemption 

Climate Change Levy and VAT 

Taxes on energy use 

No 

Electricity used for non-eligible products 

Power used to make products outside eligible sectors 

No 


For more on the individual charges, see our guides to TNUoS charges and what a DNO is. 

Who is eligible for the NCC scheme? 

Only businesses with a valid energy intensive industry (EII) certificate can claim. The certificate is issued by the Department for Business and Trade, now the Department for Business, Innovation, Science and Trade, and it's the same certificate used for the Supercharger's renewables and Capacity Market exemptions. If you qualify for those exemptions, you automatically qualify for the NCC scheme. 

The EII certificate tests 

  • Sector test: the business must manufacture a product in the UK in an eligible sector, defined by 4-digit NACE code. Eligible sectors are electricity intensive and exposed to international trade, such as steel, chemicals, cement, glass and paper. 
  • Business test: electricity costs must be at least 20% of the business's gross value added (GVA) over the relevant period, calculated using a baseline electricity price set by the government. 
  • Data: the business needs at least one quarter of financial data, plus evidence of the electricity used to make the eligible product for at least three months. 
  • Meters: the certificate covers named meters in Great Britain. Domestic meters, export meters and non-half-hourly meters aren't eligible, so qualifying sites will normally need a half-hourly meter. 

Certificates for existing holders run from 1 July to 30 June and must be renewed every year. You need to hold a certificate for the whole of any month you claim, and you can't claim for network charges incurred before your certificate was issued. The government has also committed to refreshing the eligibility data behind the Supercharger in 2026, which could change which sectors qualify. 

Who isn't eligible? 

Most UK businesses, including offices, shops, hospitality venues and the majority of SMEs, won't pass the 20% electricity intensity test. For them, the scheme matters for a different reason: they help to fund it through the EII support levy, which we cover below. 

How NCC claims work, step by step 

  1. Get your EII certificate and send a copy to your electricity supplier so the Supercharger exemptions can be applied to your bills.

  2. Register your company on Elexon's NCC portal, adding bank details and the people who will manage claims. Only a Claim Manager can submit a claim, and the Claim Manager can't also act as the Director for the same company.

  3. Calculate your Monthly Net Totals: the net total of all eligible network charges for every MPAN covered by your certificate, adjusted for any partial exemption.

  4. Gather your evidence: an electricity bill or supplier invoice showing the network charges. If your invoices don't itemise them, a director must sign a confirmation letter, which the portal sends for digital signature. Upload every relevant EII certificate too.

  5. Submit during the quarterly window. Elexon emails to confirm receipt, reviews the claim, then confirms whether it's approved, partially approved or rejected.

  6. Correct or dispute if needed. You can correct a claim before the correction deadline for each claim month, but a correction cancels the original, so every month in that window must be resubmitted with fresh evidence. After the deadline, you can raise a dispute within 28 days of the decision. 

If your supplier doesn't itemise network charges, Regulation 26 of the 2024 regulations lets you ask for a breakdown in writing. Suppliers must provide it as soon as reasonably practicable, or explain why they can't. If an invoice hasn't arrived before the window closes, Elexon recommends submitting with the information you have and correcting the claim later. 

Common reasons NCC claims are rejected 

  • The EII certificate isn't uploaded, or isn't valid for the claim month. For example, a certificate that expires on 30 June 2026 can't support a Q3 2026 claim. 
  • The invoices show a different MPAN, or a different exemption, from the one on the certificate. 
  • The director confirmation letter isn't signed. 
  • The claim is submitted outside the application window. Retrospective claims aren't possible. 

NCC claim windows and deadlines for 2026 and 2027

Q1 2026 

January to March 2026 

31 March to 30 April 2026 (closed) 

60% 

Q2 2026 

April to June 2026 

30 June to 31 August 2026 (closed) 

90% 

Q3 2026 

July to September 2026 

30 September to 30 November 2026 (open) 

90% 

Q4 2026 

October to December 2026 

31 December 2026 to 28 February 2027 

90% 

Q1 2027 

January to March 2027 

31 March to 31 May 2027 

90% 


Status as at 27 October 2026. Source: Elexon.
 


The current window, for Q3 2026 claims, closes on 30 November 2026. Correction deadlines are set for each claim month, and the next few are below. 

January 2026 

23 November 2026 

February 2026 

23 December 2026 

March 2026 

25 January 2027 

April 2026 

22 February 2027 

May 2026 

23 March 2027 

June 2026 

26 April 2027 

July 2026 

24 May 2027 

August 2026 

24 June 2027 

September 2026 

26 July 2027 

When NCC payments arrive 

Compensation is paid in arrears. The government's consultation response says the scheme pays around 12 months after costs are incurred, so the first payments at the 90% rate are expected after April 2027. Elexon publishes a payment schedule for each claim month, and approved amounts are paid against monthly credit notes. 

The EII support levy: who pays for the NCC scheme?

The NCC scheme isn't paid for by taxpayers. It's funded by the EII support levy (ESL), a levy on all licensed electricity suppliers in Great Britain. Elexon, acting as the EII Levy Administrator, invoices suppliers every month, and each supplier's share is set by its market share. Suppliers then pass the cost on to their domestic and business customers. 

The levy covers the compensation paid to EIIs for each claim month, plus Elexon's running costs and a reserve fund. For April 2026 to March 2027, Elexon has set annual operating costs at £70,421.04 and the reserve fund at £7,546,227.67. The government doesn't tell suppliers how to recover the levy, so some build it into unit rates while others show it as a separate line on pass-through contracts.

How big is the EII support levy? 

April 2024 to March 2025 (12 claim months) 

£222.2 million in total 

60% 

April to October 2025 

£20.7 million to £25.9 million a month 

60% 

March 2026 (estimated levy fund) 

£24.0 million 

60% 

April 2026 (estimated levy fund) 

£39.8 million 

90% 


Source: Elexon. Totals for 2024 to 2025 calculated by Love Energy Savings from Elexon's monthly figures.
 

The step between March and April 2026 shows the uplift in action: Elexon's estimated levy fund rose by about 66% in a single month, from £24.0 million to £39.8 million. Because compensation is paid in arrears, suppliers start paying the higher levy from April 2027, and the government committed to giving them a six-month forecast of the increase in October 2026. 

What the EII support levy could add to your bill 

The Department for Business and Trade estimated what the uplift would cost other electricity users if nothing else changed. For business customers, the move to 90% adds about £0.40 per MWh, or 0.04p per kWh. Including the other Supercharger measures introduced since 2024, the total is £1.70 to £2.00 per MWh, or 0.17p to 0.20p per kWh.

The department's own examples include a micro pub using 48 MWh a year, which would pay about £19 more, and a small manufacturer using 2,400 MWh, which would pay about £960 more. 

4,000 kWh (micro business) 

£1.60 a year 

£6.80 to £8.00 a year 

15,000 kWh (small business) 

£6.00 a year 

£25.50 to £30.00 a year 

25,000 kWh (medium business) 

£10.00 a year 

£42.50 to £50.00 a year 

50,000 kWh (large business) 

£20.00 a year 

£85.00 to £100.00 a year 

100,000 kWh (half-hourly meter threshold) 

£40.00 a year 

£170.00 to £200.00 a year 



Love Energy Savings calculation using the department's per-MWh estimates, before any offsetting measures.
 

To put that in context, the full Supercharger cost of up to 0.20p per kWh is well under 1% of the average business unit rates of 31.5p to 34.7p per kWh on our business electricity price comparison page in October 2026.


The government has also committed to bearing down on other energy system costs, for example by changing how the Renewables Obligation and Feed-in Tariffs are indexed to inflation, so that households and businesses don't see a net increase in bills. Some suppliers told the consultation they expected non-EII customers to face higher costs, though, so it's worth checking how your supplier treats the levy.

What to check if you're renewing in 2026 or 2027 

  • Ask whether your quote is fully fixed or pass-through. On a pass-through contract, changes to non-commodity costs such as the EII support levy can flow straight onto your bill. 
  • If your contract runs past April 2027, check how the supplier will handle the higher levy. 
  • Compare the full contract cost, not just the unit rate. Our business energy bill guide shows where levies and network costs sit.
  • If you use 100,000 kWh a year or more, ask our energy procurement team how non-commodity costs are priced into each offer. 

NCC scheme vs other support for energy intensive industries 

NCC scheme 

90% of eligible TNUoS, DUoS and BSUoS charges 

EII certificate holders 

Live, 90% from 1 April 2026 

EII exemption (Supercharger) 

100% of the indirect costs of CfD, RO, FiT and the Capacity Market 

EII certificate holders 

Live since 2024 

British Industrial Competitiveness Scheme (BICS) 

RO, Capacity Market and FiT costs, worth up to £40/MWh 

Eligible manufacturers that meet an electricity intensity threshold 

Applications 1 October to 30 November 2026, relief from April 2027 

UK ETS and Carbon Price Support compensation 

Indirect carbon costs passed through in electricity prices 

Businesses in listed sectors that pass a 5% GVA test 

Live 

Carbon border adjustment mechanism (CBAM) 

Adds a carbon price to imports of aluminium, cement, fertiliser, hydrogen, iron and steel 

Importers of £50,000 or more of these goods a year 

Starts 1 January 2027 



BICS is easily confused with the NCC scheme, but it's separate. It's aimed at a wider group of manufacturers, with applications open to more than 10,000 businesses, and it doesn't cover network charges.

What businesses should do now 

If you hold, or might qualify for, an EII certificate 

  • Submit your Q3 2026 claim before the window closes on 30 November 2026. 
  • Check your certificate covers every month you're claiming, and renew it before it expires on 30 June. 
  • Ask your supplier for an itemised breakdown of network charges for each MPAN. 
  • Review past claims against the correction deadlines, starting with January 2026 claims on 23 November 2026. 
  • Check whether you could also qualify for BICS or the UK ETS indirect cost compensation scheme. 

Our guide to energy procurement for manufacturing covers how to buy power for high-volume sites alongside these schemes. 

If you're not an energy intensive business 

  • Find out whether your contract is fixed or pass-through, and how the EII support levy shows on your bill. 
  • Allow for possible levy changes from April 2027 when you budget for your next renewal. 

Love Energy Savings compares business electricity from a panel of trusted UK suppliers. Whether you run a small business or a high-usage site, you can compare live prices online or speak to an expert about tendered pricing.

Network Charging Compensation Scheme FAQs

  • What is the Network Charging Compensation Scheme?

    The Network Charging Compensation Scheme (NCC scheme) is a UK government scheme that compensates eligible energy intensive industries for 90% of the electricity network charges they pay to use the Great Britain grid. It is part of the British Industry Supercharger, is administered by Elexon and is funded by the EII support levy on electricity suppliers. 

  • What is the NCC scheme compensation rate in 2026?

    The NCC scheme pays 90% of eligible network charges incurred from 1 April 2026. Charges incurred between April 2024 and March 2026 are compensated at 60%, and the 90% rate is not backdated. 

  • Who qualifies for the NCC scheme?

    Only businesses with a valid EII certificate can claim. To get one, a business must make an eligible product in an eligible sector in the UK and show that its electricity costs are at least 20% of its gross value added. The certificate only covers sites in Great Britain, and it must cover the whole month being claimed. 

  • How do NCC claims work?

    Eligible businesses register on Elexon's NCC portal and submit a claim each quarter, entering the monthly net total of eligible network charges for every MPAN covered by their EII certificate. Each claim needs supplier invoices showing the network charges, or a signed director confirmation letter, plus a copy of every relevant EII certificate. 

  • When is the next NCC claim deadline?

    The window for Q3 2026 claims (July to September 2026) runs from 30 September to 30 November 2026. The Q4 2026 window runs from 31 December 2026 to 28 February 2027, and the Q1 2027 window runs from 31 March to 31 May 2027. Late claims are not accepted. 

  • What is the EII support levy?

    The EII support levy is a charge on all licensed electricity suppliers in Great Britain that funds the NCC scheme. Elexon invoices suppliers every month based on their market share, and suppliers recover the cost from their customers, either within unit rates or as a separate pass-through charge. 

  • Will the EII support levy increase my business electricity bill?

    It could, by a small amount. The government estimates the 90% uplift adds about £0.40 per MWh to non-domestic electricity bills before any offsetting measures, which is around £10 a year for a business using 25,000 kWh. The higher levy applies from April 2027, and the government has committed to reducing other energy system costs so bills do not rise overall. 

  • What does carbon leakage mean?

    Carbon leakage means production, and the emissions that come with it, moving from one country to another because climate rules and carbon prices differ between them. It happens when high carbon costs make a UK manufacturer uncompetitive, so output shifts to a country with weaker climate policy and global emissions do not fall. 

  • What is the definition of carbon leakage?

    The UK government defines carbon leakage as the movement of production and associated emissions from one country to another due to different levels of decarbonisation effort through carbon pricing and climate regulation, which undermines overall efforts to reduce global emissions. 

  • What is carbon pricing?

    Carbon pricing puts a cost on greenhouse gas emissions so that those who emit pay for their climate impact. In the UK, the main tools are the UK Emissions Trading Scheme and Carbon Price Support. From 1 January 2027, a carbon border adjustment mechanism (CBAM) will also apply a carbon price to certain imported goods. 

  • Does the NCC scheme cover wholesale electricity or gas costs?

    No. The NCC scheme only covers electricity network charges: TNUoS, DUoS and BSUoS. It does not cover wholesale prices, supplier costs, taxes such as the Climate Change Levy, or gas. 

  • Is the NCC scheme the same as BICS?

    No. The British Industrial Competitiveness Scheme (BICS) is a separate scheme that, from 2027, exempts eligible manufacturers from Renewables Obligation, Capacity Market and Feed-in Tariff costs. It does not compensate network charges, and its first application window runs from 1 October to 30 November 2026.